Streamlined construction WITH XSITE

Streamline the operations and cut down infrastructure project costs with Novatron’s Xsite openBIM workflow

UPGRADE THE WAY YOUR WORKSITE OPERATES WITH MODEL-BASED CONSTRUCTION

Lower operational costs and better productivity in infrastructure projects

Model-based workflow helps you forecast, oversee, and finish projects more efficiently with fewer resources, less waste, and smaller costs.

With Xsite’s intelligent, easy-to-use solutions and full support for openBIM, you can use your fleet as efficiently as possible with a faster turnaround time.

save time and money
with XSite® workflow


It is normal to encounter a situation on a construction site where planning has to be updated to accommodate newly discovered data. It could involve an essential pipeline that cannot be moved or another underground obstacle.

The following timelines display the differences in delays and delivery times in a simple way. They share the same starting point.

”Excavator on-site detects an undocumented pipeline during cut. The operator has been adviced that all of the existing pipelines have to be preserved”
TRADITIONAL WORKFLOW
Day 1
Data gathering Operator informs site manager. Site manager calls a surveyor, who arrives from another site and surveys the pipeline.
Day 3
Data sent to designer Gathered data is sent to the designer, and the need for the update is explained.
Day 5
Design update finished and approved Design is sent to printing and is ready to be delivered to the site.
Day 6
Site manager gets the revisions Paper copies arrive at the site, and the manager begins distributing copies of the revision to other parties.
Day 7
Surveyors redo stakes After updating survey data on his devices, old stakes based on outdated plans are removed.
Day 8
Excavators start working Excavators start working according to the updated plans, with new stakes and copies in paper form.

Updating the plans with a traditional workflow took eight days of work.

Let’s explore the same situation, when using a model based workflow.

Xsite® WORKFLOW
Day 1
00:02 hours
Data gathering Operator does the surveying with the Operator surveys with the machine’s bucket, utilizing the machine control system, takes a few photos, and the site manager informs the designer.
00:10 hours
Data sent to designer The collected data is automatically synchronized to the Xsite MANAGE cloud service and is immediately available to the designer.
04:00 hours
Design update finished and approved The new design is uploaded to Xsite MANAGE in a ready-to-use format.
04:01 hours
Site manager gets the revisions Machinery receives notification of updated plans, and old versions are replaced.
04:05 hours
Excavators start working Excavators start working according to the updated plans, gathering as-built data along the way.

Updating the plans with a model based workflow took only four hours!

Total time: TRADITIONAL WORKFLOW 8 working days
Total time: Xsite® WORKFLOW 04:05 hours

The RESULTS


The traditional method took days, while a model-based process took mere hours. Even if the traditional method were rushed by a couple of days, the difference would still be substantial.

Benefits of the Xsite® Workflow

Follow progress in real time

When information flows wirelessly from the machines to the office, you will be able to follow the progress of your project and fleet.

Easier and faster to update plans

With model-based workflow and machine control, updating the latest plans available to everyone can be done in a few minutes.

Better productivity for your fleet

When everyone has accurate, up-to-date information at hand, there’s no need for redos or waiting around for plan updates.

No data loss or file conversions

Xsite’s support for open data formats allows the metadata to be preserved when moving information from one system to another.

Right information in the right place – in real time

Optimize workflows with data and bring your control of detail to a new level. Xsite transforms the project specifications into an easily digestible visual format for all users.

The Xsite® ecosystem is based on open standards and non-proprietary formats. This enables seamless data exchange between all parties.

The regulations and your customers’ expectations are changing. With Xsite, you can stay in the frontline!

Are you ready to upgrade the way you operate?

Since the early 1990s, Xsite® has been at the forefront of earthmoving technology, providing field-proven solutions that have revolutionized the industry.

Don’t let outdated technology hold you back. See our products to see how Xsite® Machine Control Systems can help you get the job done faster and with greater precision.

OPENBIM IN INFRASTRUCTURE CONSTRUCTION

Utilizing OpenBIM helps you forecast, oversee and finish projects more efficiently with fewer resources, less waste, and smaller costs. Watch the video below and learn about the key benefits of openBIM in the model-based infrastructure construction process.